Integrating LOIN-driven Information Exchange Connected to Construction Production Planning

Jonatan Lindholm1, Torbjörn Jansson2, Peter Johansson1, Ibrahim Yitmen1
1 School of Engineering, Jönköping University, Sweden
2 IT - Data Foundation, Skanska, Sweden
DOI: 10.35490/EC3.2025.304
Abstract: In construction projects, frequent changes to time planning result from unforeseen events, impacting both timing and scope of information exchanges (IE). Currently, IE planning and production planning are performed independently with limited integration between the two, leading to inefficiencies when changes are needed. This study proposes a unified approach facilitating Level of Information Need (LOIN) to systematically identify and link to required IEs for the production phase. The mapping was co-developed with and evaluated by industry professionals to ensure practical relevance. Integrating LOIN-driven IE mapping into production planning enhances responsiveness to schedule changes by providing structured guidelines for information delivery.
Keywords: information exchange, LOIN, process modelling, production planning

Presentation video

Successfully submitted

Your submission has been received. We will review your details and contact you soon.